I did start another project and once again this is pushed back to once a week of work.
All the 1708 was cut to wrap the inside frame.
The frame is made from 3/4 marine plywood and
the square edges are rounded.
I found it better to number each piece of cloth
and lay it out on a sheet of cardboard, then wet it out.
Take the next piece and lay it on top and wet that out..
seems to work well and has little material waste.
Part is finish sanded, and I started running the lines inside.
Figure I'll do the big stuff now so I'm not crawling inside and
out threw a canopy hatch.
