After the stringer was installed it was time to replace the bulkheads that hold the gas tank in. Since the inside was prepped already, all I had to do was cut, fit, bond, and glass them in. Again, I left the camera at home for a good amount of the following work. I used the same processes as I did with the stringers. Once installed I decided to tackle the last two stringers at the same time. Winter was coming and I wanted to speed it up. I made a template of one of the stringers and used it to cut all the peices. I bonded them up using to layers of 1/2" ply. In between them, just like the transom, I used one layer of1300 biax and made sure to stagger the joints. I did all the bonding while the shop was clean still from installing the stringers & bulkheads. Once bonded, I then cut out the old and prepared for the new. That brings me to the pics below...