Might finish my garage heater install today. Since it will be 60.
It's mounted, (suspended from threaded rod that goes to unistrut in the attic). Electric is run, (Ran it all the way to the panel and created a new circuit for it). Installed a T in the line to my hot water heater in the utility room. (Using black pipe for my gas). And cut the hole in my garage ceiling for the vent. I just need to make my hole in the roof, slap my 4 inch B vent together and finish my gas line. Running 3/4 inch ID black pipe across the attic on threaded rod stubs with split ring hangers.