Counting down the days!
Engines are in & will be fired up on the hose today!!!!
Ilmor on site at Skater tomorrow to update software & get the engines, trans & drives communicating w/ each other.
Basically the only remaining items are painting & installing hatches, wire up L.E.D. indicators & sea trial. Peter has rounded up 6-8 sets of props & from what I understand from Trevor & Paul is that their on water test sheet is very detailed documenting everything from conditions, to temps, rpm, drive & tab position, speed as well as using a stop watch to time on plane & roll on performance. Way beyond just putting around for 5 mins & checking for leaks. Props will be spun in to begin with since thats how they ran last but ultimately the best setup will be rotated outward as well.
Pics attached show my helm & console before, the sticks relocated to the center & where the indictaors will go. Speedo gets removed & replaces the compass above the radio.