tHANKS SO MUCH ,,,,NEW GPS INSTALLED AND WORKING. IT WAS REAL HARD TO REMOVE THE NUTS. i JUST USED NUT DRIVERS, HAD TO RUN A DRILL DOWN THEM IN MAKE THE HOLE LONGER THAT FITS OVER THE THREADED SCREW, SINCE THE THREADED AREA OF THE SCREW WAS 2 INCHES LONG...
Thanks again, pictures was helpful;
That PSI looks nice,.... the top pulley is too big though. That can be fixed. Save it for the tri-toon! We only need 11 more, we are using 14 nitro motors right?
That PSI looks nice,.... the top pulley is too big though. That can be fixed. Save it for the tri-toon! We only need 11 more, we are using 14 nitro motors right?
I think Sean added the flat-screen monitors last summer or something. Sick boat. Heard he's got a new "toy" for this year. And I hope to see Monopoly out playing around more this summer!