A long time has passed. Engines are together, have been run and are bagged and waiting. Steering was returned from Latham long ago. Cylinders reconditioned, new hoses and fittings, new rear plates and bolt kits. All still boxed. Picked up a a pair of drives and another pair of props. The set now includes a pair of 23,24, and 25 Mirages along with the 26 Hydromotives that came with her. Transom is filled, stringers repaired and getting final touches to prepare engine box for paint and outside transom paint scheduled in the coming weeks. Trannies crated and on their way for rebuilds. The end is almost in sight.